Type of research: applied Duration from: 01/01/91. to 12/31/94. Papers on project (total): 28
Papers on project quoted in Current Contents: 5
Institution name: Građevinski fakultet, Zagreb (82) Department/Institute: Department of construction management and organisation Address: Kačićeva 26 City: 10000 - Zagreb, Croatia
Communication
Phone: 385 (0)1/440857
Fax: 385 (0)1/416621
Summary: Construction project is of great importance in our economic
system, especially at present moment of market re-establishment and
re-structure of construction firms as regard ownership. Reestablishment of
optimal system of indterdependent relation of organisation of the firm and
constructing should result in a model which will most easily fit into
market economy and also be acceptable as regards time needed end expenses
of construction.
Keywords: optimalisation, organisation and building technology, construction company in market conditions
Research goals: At time of restructure of the economy t market
system of management and production it is necessary that construction
firms fit into that system. The basic aim is to investigate the
construction project as a whole, a construction site as a product realised
by retional organisation and by technology adopted to optimal organization
of the firm in the market economy. The basic precept of the study is to
define all possible elements of individual subsystems (technology,
organisations, technology-economy, management, control) and their
coordination with the aim to minimize the expenses, but ensuring the
quality at optimal time of constructing. It is expected that results of
this study will be used in practice in construction firms, they will be
tested and proposed for wider application. Other information about the project.